Home > Tutorials

Stage I - Georgiou AI & Timecapture Workshop™

mcorp logo

Process Review

Requirements Documents (Stage I)

Sample inputs for Stage I

Sample output for Stage II (Plant)

Starting with the Award Interpreter (@ Georgiou)

The Award Interpreter Basics

Entering TimeSheets

TimeSheet Exception Reports

Adding New Employees to PowerForce

System Specification (Project Details)

Stage I

Integrating PowerForce & Georgiou Payroll

System Requirements

AI / Payroll Implementation

Backoffice Behind the Job

Payroll generation from a Time Sheet®

Configuring the Timberline output directory®

Reporting

Miscellaneous Environment (Server) Setup

Team Codes upload.

Employee data synchronisation

Installing the SRP ocx controls for Release 9.

Top of Page

PowerForce Professional Services

Stage I Requirements

?

Data Input

Time Sheet Entry (nvt_001)

Time Sheet Entry (nvt_002)

Time Sheet Entry (nvt_003)

Time Sheet Entry (nvt_004)

Process Customisation

Payroll export -

REPUTL06 -

REPUTL07 -

Current WIP

Design Data interface into AI (WIP)

Design Data interface out of AI (WIP)

Design reports (WIP)

Speed up timesheet entry (WIP)

Top of Page

Other Tutorials

Top of Page

Article updated by PowerForce Software on Monday, October 18, 2010.

Copyright ©2007-2013 Envizion Systems - All Rights Reserved - Terms of Use.